10th May 2022
After 6 months of development, the very first generation stimulator built for the Rose project was tested on May 10th 2022 in Dresden with members from EPFL, Aryballe, CNRS and Dresden.
![](https://rose-h2020.eu/wp-content/uploads/2024/04/May_2022_1st_gen_Dresden.jpg)
![](https://rose-h2020.eu/wp-content/uploads/2024/04/May_2022_1st_gen_Dresden2-edited.jpg)
10th May 2022
After 6 months of development, the very first generation stimulator built for the Rose project was tested on May 10th 2022 in Dresden with members from EPFL, Aryballe, CNRS and Dresden.